2023 Collection System Rehabilitation Project (CIP 22701)
The general scope of work for this project included in the base bid and bid alternate is the rehabilitation and/or replacement of 4", 6", 8", 10", 12" and 18" sewer mains by the following methods: Approximately 18,900 LF by cured in place pipe (CIPP) lining, 9,200 LF by pipe bursting, and 850 LF by open cut methods. Also included in the scope of work is the rehabilitation or replacement of approximately 540 laterals and 51 sewer structures within the project area.
    
    
    
    
    
    
    Status
Bidding Closed
| Prebid Date | 11/15/22 2:00pm | 
| Bid Date | 12/6/22 2:00pm | 
Company & Contacts
NapaSan 
                                            Michael Fitch  
                                                                707-258-6030
                                                        Location
Napa, CA
The estimated cost of construction for the Bid Schedule is $7,000,000.

