Project Description: The general scope of work for this project includes replacement of approximately 180 LF of 36” steel primary influent pipe with FRP, preparation of approximately 1650 LF of 54” reinforced concrete pipe and Primary Diversion Structure for condition assessment by others, installation of a new magnetic flow meter on a 36” steel pipe, hypochlorite mix box improvements, and demolition of an existing polymer tank and installation of a new polymer tank.
Status
Accepting Bids
| Prebid Date | 1/21/26 10:30am |
| Bid Date | 2/10/26 2:00pm |
Location
Napa, CA
A mandatory pre-bid meeting and site visit will be held at 10:30 AM local time, on January 21, 2026 at 1515 Soscol Ferry Road, Napa CA 94558.