North Napa Siphon Gate Replacement Project (CIP 21718)

The general scope of work for this project includes removal of three existing hydraulic stop gate frames and replacement with three new corrosion resistant slide gates, removal of three existing manhole frames and covers and replacement with three composite structure frames and covers, and installation of odor control inserts at the existing North Napa Siphon Inlet Structure. The estimated cost of construction is $330,000

Status

Bidding Closed

Prebid Date1/4/22 3:00pm

Bid Date1/18/22 2:00pm

Company & Contacts

NapaSan
Karl Ono  
707-258-6013

Location

Napa, CA

An optional pre-bid web-meeting will be held at 2:00 pm on January 4, 2022 via the following link:

https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTRkZTMwMzYtNTE5MS00MmJkLTkzYmQtYjRiM2E4YjNjMjYx%40thread.v2/0?context=%7b%22Tid%22%3a%228966ba07-3d47-4447-a9cf-28c75b10802d%22%2c%22Oid%22%3a%228e6d5b35-0a95-467c-b6b4-e92e86d5b344%22%7d

The pre-bid conference may also be joined by telephone by calling (323) 591-9484.
Conference ID: 804 350 747#.

The estimated cost of construction is $330,000.