2023-2024 Treatment Plan Improvement Project (CIP 22706)
The general scope of work for this project includes replacement of two primary clarifier drives and two secondary clarifier metal componets, and a new secondary clarifier coating system. Also included in the scope of work is the replacement of the ferric chloride chemical storage tank, piping, valves, accessories, and coating system replacement; sodium bisulfite chemical storage tank, piping, valves, accessories, and coating system; RAS/WAS wetwell discharge elbows and piping; H-Pad piping valves and pipe coating system; secondary effluent pump station valves; and Pond 4 pump station valves.
    
    
    
    
    
    
    
            