West Napa Pump Station Replacement Project (CIP 17711)

The Project primarily includes construction of a new submersible wastewater pump station with attached valve vault, electrical building, standby generator, odor control system, and solar panels including site work, civil, mechanical, architectural, structural, electrical, instrumentation, and demolition work located at 240 S. Coombs Street in Napa, CA. The existing pump station will be demolished upon start-up and acceptance of the new pump station. A valid Class A California contractor’s license is required to bid on the Project.

Status

Bidding Closed

Prebid Date1/9/20 3:00pm

Bid Date2/19/20 2:00pm

Company & Contacts

NapaSan
Robin Gamble Holley: rgamble@napasan.com  
707-258-6031

Location

Napa, CA

Bid Opening: February 19th, 2020 at 2:00PM

Estimated cost of construction is $8,450,000 ($8.45M)

A mandatory pre-bid conference will be held at 3:00 pm on January 9, 2020 at 240 S. Coombs Street, Napa, CA.

*This Project is SRF funded. Contractors submitting a bid are required to perform Good Faith Efforts, including posting solicitations for bids and proposals to Disadvantaged Business Enterprises (DBE) for a minimum of 30 calendar days before the bid opening.