2021 Collection System Rehabilitation Project (CIP 20703)
The work includes rehabilitation and/or replacement of 4”, 6”, 8”, 12”, and 15” sewer mains by the following methods: 13,000 LF by pipe bursting, 2,200 LF by cured in place pipe (CIPP) lining, 3,400 LF by sliplining, 160 LF by open cut and replace
Addendum 1
(click to expand/collapse)

Name | Size | |||
CIP 20703 - Addendum 1 | 9.7 MB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
CIP 20703 - Addendum 2 | 279.0 KB |
Addendum 3
(click to expand/collapse)

Name | Size | |||
CIP 20703 - Addendum 3 | 179.7 KB |