Outfall Abandonment Project (CIP 23743)

The general scope of work for this project included in the base bid are as follows: (1) removal and replacement of existing tide gates; (2) partial demolition and retrofitting of a 72-inch corrugated metal pipe riser (Outfall #2); and (3) complete demolition and removal of 54-inch, 12-gauge, asbestos lined and bituminous coated corrugated metal outfall piping and fittings (Outfall #3). Also included in the scope of work as a bid alternate is the partial demolition/removal and abandonment in place of three (3) 21-inch, 14-gauge, asbestos lined and bituminous coated corrugated metal outfall piping, abandonment of 36-inch, 14-gauge, asbestos lined and bituminous coated corrugated metal piping and demolition and abandonment of a 72-inch corrugated metal pipe riser.